PROJECT COMPLETED 2024

SCHOOL INFRASTRUCTURE NSW (SINSW)

Channel Drain Installation on Curved Pathway

The licensed plumbers at All Day Plumbing took on a challenging and intricate task for School Infrastructure NSW (SINSW). We were responsible for supplying and installing a heavy-duty channel drain along a curved pathway, ensuring seamless joints and maximum efficiency in managing overland water flow.

This project was crucial for preventing water accumulation and potential flooding on the school ovals, ensuring the infrastructure could withstand heavy rainfall without disrupting school activities.

plumber near me in Sydney

Project Objective

The curved pathway near the school’s ovals required a highly effective drainage system to manage overland water flow and prevent flooding. Without proper drainage, the pathway and adjacent areas were at risk of water pooling, which could damage the grounds and disrupt school use.

Our goal was to design and install a seamless, heavy-duty channel drain system capable of efficiently directing water away from the ovals and surrounding areas, maintaining the functionality and safety of the school grounds during periods of heavy rain.

Our Strategy

After a thorough assessment of the site, we developed a targeted solution designed to meet the unique challenges posed by the curved pathway. Our strategy was focused on the following key areas:

Supply and Installation of Heavy-Duty Channel Drain:

The curved nature of the pathway meant that a standard drainage solution would not suffice. We sourced and installed a specialised heavy-duty channel drain system designed for curved pathways. This system not only provided robust water management but also ensured a seamless appearance that blended with the existing infrastructure.

Seamless Joints for Maximum Efficiency:

To enhance the drainage system’s durability and functionality, we incorporated seamless joints into the design. This approach allows for smooth water flow, minimising the risk of blockages or interruptions, and ensuring the system can handle large volumes of water efficiently.

Project Execution

Our team used high-quality materials tailored to the specific demands of the project. The seamless channel drain system was meticulously installed along the curved pathway using advanced tools and techniques. The result is a highly efficient system capable of managing overland water flow, preventing flooding, and maintaining the integrity of the ovals during wet weather conditions.

Throughout the project, we adhered to strict timelines and quality standards, ensuring minimal disruption to the school’s daily operations. The installation was completed with precision, and the system is now equipped to handle heavy rainfall for years to come.

Why Choose All Day Plumbing?

All Day Plumbing is your go-to for complex plumbing projects that require precision and expertise. With a proven track record of delivering high-quality, durable systems for educational institutions, we ensure that every project is completed to the highest standard. Our work with School Infrastructure NSW on this project demonstrates our commitment to providing seamless, efficient, and long-lasting solutions.

Contact us today to discuss how we can meet your infrastructure and plumbing needs with tailored solutions designed for reliability and efficiency.