All Day Plumbing partnered with Ryde City Council to upgrade the water management system for their community oval. This project focused on constructing a new overflow drainage system that would connect runoff from a neighbouring complex to the existing oval pit. The goal was to enhance water flow management and prevent potential flooding on the oval and surrounding grounds during heavy rainfall.
With our expertise in designing and implementing efficient drainage solutions, we ensured the new system provided long-lasting protection for the area.
The existing drainage system at Ryde City Council’s oval was insufficient to manage the excess runoff from a neighbouring complex, which increased the risk of flooding. The primary goal of this project was to construct an overflow connection that would seamlessly direct runoff into the existing oval pit, ensuring water could be efficiently managed and minimising the chances of water damage to the oval and surrounding areas.
Our solution was to create a robust, durable system that would significantly improve the oval’s water management capacity.
The key to this project was constructing a new overflow connection that could efficiently channel excess water from the neighbouring complex into the oval’s drainage system. This involved precise excavation and careful integration with the existing infrastructure to ensure smooth water flow and prevent any future blockages.
We engineered a connection to the existing oval pit to handle the increased water volume. This solution allowed the pit to accommodate runoff from both the complex and the surrounding grounds, greatly reducing the risk of flooding. Our design ensured that the water was directed into the pit smoothly, preventing overflow during periods of heavy rain.
Using high-grade materials and advanced installation techniques, our team constructed the new overflow system with precision. The excavation and connection work were executed with minimal disruption to the oval and the surrounding environment, ensuring that the project was completed on time and to the highest standard.
The result is a drainage system capable of handling increased water flow, providing Ryde City Council with an effective and reliable solution for managing runoff and preventing future flooding on the oval grounds.
At All Day Plumbing, we specialise in delivering customised plumbing solutions for local councils and public spaces. Our team’s extensive experience with complex drainage projects ensures we provide reliable, long-term solutions tailored to the specific needs of our clients. Our work with Ryde City Council demonstrates our ability to solve water management challenges with efficient and sustainable systems.
Get in touch with us today to discuss how we can assist with your next plumbing or drainage project.