With over two decades of industry experience, the licensed plumbers at All Day Plumbing have completed numerous projects across various industries and building types. For this project, we upgraded the stormwater and drainage system at Beauty Point Public School, ensuring compliance, durability, and high attention to quality throughout.
Our scope of work involved installing a new heavy-duty channel drain and stormwater system on the eastern and northern sides of the school. This included upgrading stormwater pits, installing new pipes, and improving the overland stormwater management system to prevent future drainage issues.
The outdated stormwater system at Beauty Point Public School posed risks of flooding and water damage, potentially threatening the structural integrity of the buildings. Our goal was to install a compliant, heavy-duty system capable of managing large volumes of water efficiently, while protecting the school and minimising the spread of water pollutants. The new system, designed for the school’s eastern and northern sides, now channels stormwater runoff effectively away from the property, significantly reducing the risk of flooding and water damage.
The existing stormwater pits were compromised by wear and tear, leading to cracks, leaks, and blockages. We upgraded these pits to enhance their capacity, ensuring efficient water collection and reducing the risk of flooding.
We replaced old, damaged pipes with high-capacity pipes designed to transport large volumes of water efficiently. These new pipes are built for long-term durability, minimising leakage risks and ensuring smooth water transport.
To handle excess water that could overwhelm the underground pipes during heavy rainfall, we expanded the overland system. This included adding surface channels (swales) to manage stormwater runoff in flood-prone areas, providing the school with an extra layer of protection against water damage.
We selected high-quality materials for the stormwater and drainage system, including durable pipes and pits that can withstand heavy rainfall and prolonged use. Utilising the latest plumbing technology, we executed the installation with precision. Specialised equipment such as excavators, cranes, and hydrostatic test pumps ensured a flawless installation process. These upgrades will provide long-term protection for Beauty Point Public School, significantly reducing the risk of flooding and ensuring the integrity of the buildings for years to come.
For reliable plumbing solutions tailored to government and educational institutions, trust All Day Plumbing. Our proven track record in delivering compliant, efficient, and durable systems ensures that your project will be handled with the utmost care and professionalism. Our work at Beauty Point Public School stands as a testament to the quality and longevity of our stormwater management solutions.
Contact us today for a consultation, and let’s discuss how we can provide the plumbing solutions you need.